Drilling Innovations That Will Forever Change the Oil Industry



Oil drilling has now been practiced for over a century. The sector has developed by leaps and bounds as a result of several technological breakthroughs. This expansion has resulted in new advances in oil production that are altering the face of our civilization.

As early as 1880, the globe witnessed one of the earliest developments known as the rotary drill, which dramatically enhanced the oil drilling process. This rotary drill, however, was just the beginning of a lengthy line of subsequent developments that would eventually replace it in the twentieth century. In this post, we'll look at some of the most significant breakthroughs in oil production efficiency.

1. Offshore Drilling and ROVs

Oil drillers quickly discovered that wells located near seashores generated the most oil. This is why the industry needed to develop technologies for extracting oil from the seafloor. Drilling companies built oil rigs on several wharves in the 1980s, but the first oil well on land was discovered somewhere about 1947.

Remotely operated vehicles were among the early technologies that aided the establishment of these offshore drilling enterprises (ROVs). The US military was already using this technique to recover equipment that had been lost at sea. The oil sector was exploiting ROVs for their own purposes by the 1970s.

2. Hydraulic Fracturing

Fracking, or hydraulic fracturing, is another new technology that Shale Gas relies on. This approach, which was created in 1940, has grown in popularity. Fracking is based on tight reservoirs, which often contain oil-bearing rocks with small holes, implying that the flow of oil from these is limited.

Drillers utilize fracturing to stimulate these wells by putting chemicals mixed with water into the well to produce pressure. This pressure, in turn, causes fractures in the rocks that can be hundreds of feet long. After these fissures are created, oil is allowed to flow freely out of the rock. According to numerous studies, fracking has contributed to an additional seven billion dollars oil barrels from wells in the United States.

3. Seismic Imaging

Initially, looking for oil wells was based solely on where oil had bubbled to the surface. Because most oil wells are buried far beneath the earth's surface, they cannot be discovered. Digging deep wells to set up rigs only to find barren patches was also highly costly.

Geologists were brought in to devise methods for locating oil wells that were hidden. They devised numerous approaches, the most important of which was 3-D seismic imaging. This system transmits sound waves into the ground and detects signals as the waves bounce off of obstacles.

This technology not only assisted in locating the most productive locations for establishing oil production units, but it also reduced the number of holes that were drilled without success.

4.   Measurement-While-Drilling Systems

One major disadvantage of seismic technologies was that they did not provide drilling operators with precise information about the amount of oil they were working with. These concerns were resolved in the 1980s thanks to a technology known as measurement-while-drilling (MWD).

With this system and its reliance on'mud pulse telemetry,' operators were able to collect and analyse real-time data, allowing them to establish the state of the oil well. This technology, in turn, enabled operators to drive oil wells in different ways based on the data they had gathered.

5.   Horizontal Drilling

We emphasized the potential of operators to steer their oil drilling operation in multiple directions while discussing MWD technologies. This capacity to drill in directions other than straight has become one of the most significant technological achievements in the history of the oil drilling process.

Oil reservoirs tend to be spread out horizontally from time to time, making vertical wells an ineffective method of extraction. This is why these technologies enable operators to dig vertically initially and then pivot to a horizontal well at the 'kick-off point.'

This technology has not only enabled the extraction of oil from horizontal wells, but it has also assisted operators in conducting their operations in a more environmentally friendly manner. The first horizontal wells were dug in 1929, but the process was prohibitively expensive at the time. However, with the introduction of hydraulic fracturing, horizontal drilling became a more inexpensive and realistic choice. By the late 1980s, nearly all oil drilling companies across the world were adopting horizontal drilling.

Read More → Drilling Innovations That Will Forever Change the Oil Industry

Key of Technologies are Advancing Oil and Gas Drilling

Oil and gas (O&G) is still a thriving industry, managing $1.7 trillion USD per year and requiring over 94 million barrels of petroleum per day globally. It is expected that demand for fossil fuels would rise by around 25% during the next 22 years. As a result, in an era when automation, digital process control, and IoT are regarded as "common innovation processes," oil and gas companies have begun to adopt technologies that can assist them in gaining access to small isolated offshore reservoirs as well as areas characterized by extreme environments.

The 2016 Upstream Oil and Gas Digital Trends Survey identified eight critical areas in which the O&G industry should adjust in order to reap the benefits across their extractive environments. The fastest developing fields among them were robotics and drones, artificial intelligence, and wearable technology.

At the moment, more than 80% of Oil and Gas enterprises are undergoing a digital transformation that has the potential to unleash $1.6 trillion USD by enhancing reliability, optimizing operations, and creating new value. Furthermore, the adoption of "common innovation processes" can assist the O&G industry in gaining environmental credibility because robotics and drones, artificial intelligence, and wearable technologies offer tangible options for reducing greenhouse gas emissions, saving water, and avoiding oil spills, for example. Finally, modern operational technology translates into more efficient and less risky operations, and has the potential to deliver a wealth of process data to optimize O&G extraction procedures.

A number of developing technologies can help the O&G business comply with health, safety, and environmental regulations while also being cost-effective.

Robotic drilling systems (RDSs) provide entirely unmanned drill floors for both land and offshore operations. RDSs can handle pipes and tools, as well as replace casing crews and tongs, and they can handle machinery that revolve. Furthermore, cutting-edge drilling technology provides self-moving autonomous drill rigs that may be transported around an oil field from one well position to the next.

In-pipe inspection robots (IPIRs) can identify fractures, corrosion, and severe problems in pipes, which can cause pipe failures and halt output. These robots have nondestructive testing sensors that are embedded in the pipeline network. IPIRs operate autonomously at this point. They can send data and control signals; for example, IPIRs feature wireless sensor networks (WSNs) that can detect sand buildup, pipe damage, vandalism or theft, and fluid leaks in addition to monitoring pipeline integrity. WSNs are intended to communicate across the relay node, transmitting data to a single base station.

Unmanned aerial vehicles (UAVs) are another option for inspecting O&G facilities. Drones are increasingly being used to monitor tanks, pipelines, and refineries on a regular basis. Drones are frequently operated from a ground control station, necessitating the use of advanced flight control algorithms, inertial navigation, data fusion, and tracking control. These characteristics make drones useful for exploring O&G reservoirs in severe situations where human investigation is not feasible. To undertake faster and safer inspections, drones can be outfitted with a thermal camera, lights, and optical camera operators.

Aside from smart sensors and machine interface, recent advancements in 4D seismic data gathering and computer capacity are assisting O&G businesses in capturing more accurate subsurface geology for finding fossil fuel resources.


Oil and gas corporations who are already looking ahead:


Maersk Oil has established a new unmanned platform, the Tyra Southeast-B, in the Danish North Sea, following the operation of the first unmanned, fully automatic, and remote operating platform, the Norwegian Oseberg H, located on the Norwegian Continental Shelf. Tyra's reserves are predicted to grow by 50 million barrels of oil equivalent (MMBOE) during the next three decades.




Statoil, Enegi Oil (Nu-oil), the Wood Group, and the China Offshore Oil Engineering Company are concentrating their efforts on operations to access more minor reservoirs. Small reservoirs have recoverable reserves of less than 20 MMBOE. According to Enegi Oil, there are 88 fields in the North Sea with fewer than 15 MMBOE that can be developed using buoy technology, for example. Others are taking notice of the region north of the Arctic Circle, which "may contain roughly 30% of the world's undiscovered gas and 13% of the world's unknown oil deposits."

In Canada, Statoil and Husky Energy are exploring drilling for oil and gas resources in deep-water, far-offshore oil 500 kilometers off Canada's east coast, in the Flemish Pass Basin, using ocean and subsea technology, remote sensing, and autonomous underwater vehicles.

To summarize, automation and digitalization may provide certain benefits to the oil and gas industry in terms of safety, environmental performance, public health, productivity, operations, efficiency, reliability, and investment. To remain competitive, oil and gas companies must evolve, as the means in which energy is generated, consumed, and distributed have changed tremendously. We are living in an era in which people have more decision-making power based on real-time data.


Read More → Key of Technologies are Advancing Oil and Gas Drilling

Tuesday, March 5, 2019

Optimizing Completion Timing


Recent studies tying subsurface stress conditions and mechanical properties of rocks to physical processes are providing a glimpse into the best methodologies to stimulate a reservoir to maximize fracture network complexity.
Using a geomechanical approach to fracture characterization has revealed that continuous pumping completion systems (e.g., ball-activated systems) achieve higher fracture complexity and surface area in the reservoir, resulting in higher drainage efficiency when compared to startand- stop completion systems (e.g., plug and perf).
Hydraulic fractures are typically modeled as a single fracture because only one set of treatment measurements is available, such as treating pressure. The surface pressure response, treatment rate and proppant concentration are translated into a single planar fracture with a corresponding height, length and width. This can be a gross oversimplification of the actual fracture complexity.
This model also does not take into account continued deformation of the rock mass over a longer time period. During stimulation the reservoir is forced to accommodate additional volume. Time-dependent strain of the rock mass is typically not considered once a stage has been sealed off in the wellbore and operations have moved on to the next stage.
Key mechanisms controlling stress redistribution are the magnitude of the stress differential within the fracture relative to the minimum stress and the rocks’ ability to accommodate it through elastic and inelastic processes.
If there is a time lag associated with operations, it is impossible to apply additional strain before energy loss and fracture closure begins. In a continuous pumping operation, the timing enables added stress to the system before the first initiated fracture is in a mode of closure.
Start-and-stop versus continuous pumping
Operational differences between completion methodologies impact geomechanics, stress distribution and fracture complexity, which ultimately correlates to reservoir drainage.
As slurry enters the reservoir for the first stage, the rock mass is forced to accommodate additional fluid and proppant. The resulting fracture adds pressure along the fracture face. The dissipation of this pressure manifests as a stress shadow that extends out into the surrounding rock through leak-off, elastic strain and inelastic strain. At this point in the treatment, the stress mechanisms are identical for both completion methodologies.
In start-and-stop completion operations, energy is lost from the fracture system after the first stage. The well is flushed to displace proppant remaining in the wellbore, ensuring that wireline tools are not obstructed. Tools for the next stage are pumped down using additional fluid that displaces proppant from the fractured interval. Perforating the next stage creates a new leak-off path for excess pressure from the previous stage’s fracture. Excess stress in the fracture can equalize within the wellbore and reservoir. This equalization, or redistribution of stress, allows fracture closure.
Small losses in energy from the area of interest can have tremendous impact. The net effect of a change in the proppant distribution and stress dynamics are shorter and fewer complex fractures with less near wellbore conductivity.
In continuous pumping completion operations, stress in the local rock mass is at a maximum and the continuous addition of fluid to the system can be seen as the addition of energy. Following the first stage, spacer fluid is pumped down, followed by an actuation ball to isolate the previous stage and immediately begin operations for the second stage. When the ball lands in the sliding sleeve, the next stage is treated without interruption.
These operations eliminate stress redistribution. The timing of the next fracture is at a point that can maximize and retain stress in the stimulated rock, leading to further ranging stress shadow effects (see Figure 1 above).
Since continuous pumping completions are in a continuous mode of fracture propagation by virtue of the uninterrupted addition of fluid, the stress shadow interactions between sequentially created fractures are maximized. The second fracture further alters the stress state, and the stress shadows associated with each fracture have an additive effect on the rock mass between the fractures. The benefits of this process include added fracture complexity and improved drainage efficiency through greater fracture surface area.
Case studies
A study from a group of wells in the Montney Formation of the Western Canada Sedimentary Basin indicated fundamentally different geomechanical processes in start-and-stop and continuous pumping completions. The continuous pumping completions achieved higher EUR by more than 40% compared to the start-and-stop completions.
In addition to the production study, analysis of microseismic interpretations showed distinctive differences between the events recorded in each type of completion. The study’s conclusions included
  • A significantly greater number of seismic events occurred in wells using continuous pumping completions systems, and larger magnitude microseismic events occurred at all distances from the well;
  • Strong fracture complexity was evident in the wells using continuous pumping completions but not in the start-and-stop wells;
  • Lower magnitude focal mechanisms in start-and-stop wells indicated that these treatments followed preexisting fracture pathways rather than developing new planes of failure; and
  • The increase in production was directly related to the development of new fractures identified from microseismic data (Figure 2).
Another study in the Montney Formation examined the impact of continuous pumping completions fracture propagation on a producing well from two offset wells using microseismic data and a simulation model.
Well 1 was a producing well, and Well 2 and Well 3 were completed using a continuous pumping completion system. All 16 stages of Well 2 were completed in two days. The first 15 stages of Well 3 were completed the following two days, and then the final five stages of Well 3 were completed after an 11-day shutdown.
The results of the observations and simulation analyses offered insights:
  • Production depletion can affect the stress in adjacent rock volumes, even if they are hydraulically isolated from the producing wells. This affects the stimulation patterns of completed wells;
  • The prolific fracture propagation pattern of Well 3 likely resulted from the stress shadow influence of Well 2 and the rapid execution of successive stages in Well 3; and
  • Stress shadow influences on the final five stages of Well 3 were absent because of the long interruption of operations, which was due to stress redistribution.
Conclusion
Studies examining stress mechanisms in the reservoir during stimulation showed clear differences between continuous pumping and start-and-stop operations.
The rapid sequential execution of stage treatments was beneficial to managing fracture propagation. The continuous pumping completions resulted in higher fracture complexity because they did not allow time for pressure in the hydraulic fracture to dissipate through the reservoir.
Furthermore, the stress shadows created by the fracture system of each stage had an additive effect, contributing to higher fracture complexity and improved drainage efficiency.
Read More → Optimizing Completion Timing

Extended Reach Drilling (ERW)

Drilling technology extended
Extended Reach Drilling

An extended-reach well is one in which the ratio of the measured depth (MD) vs. the true vertical depth (TVD) is at least 2:1.
Extended-reach wells are expensive and technically challenging, however, they can add value to drilling operations by making it possible to reduce costly subsea equipment and pipelines, by using satellite field development, by developing near-shore fields from onshore, and by reducing the environmental impact by developing fields from pads.
Extended Reach Drilling allows producers to reach deposits that are great distances away from the drilling rig and this help producers tap oil and natural gas deposits under surface areas where a vertical well cannot be drilled, such as under developed or environmentally sensitive areas.
Today, as the Horizontal Drilling, also the Extend Reach Drilling use the technology of the “RSS: Rotary Steerable System” that permit to steer an hole continuing the rotation of the drilling string with an improvement of the safety and the drilling efficiency.
Moreover, the selection of a drilling fluid must balance a number of critical factors.
The fluid must provide
  • a stable wellbore for drilling long open- hole intervals at high angles, maximize lubricity to reduce torque and drag, develop proper rheology for effective cuttings transport, minimize the potential for problems such as differential sticking and lost circulation, minimize formation damage of productive intervals.
Pipe rotation is another critical factor in hole cleaning.
The objective of the hole- cleaning program in ERW is to improve drilling performance by avoiding stuck pipe, avoiding tight hole on connections and trips, maximizing the footage drilled between wiper trips, eliminating backreaming trips prior to reaching the casing point and maximizing daily drilling progress.
Read More → Extended Reach Drilling (ERW)

Sunday, December 3, 2017

Optimizing Artificial Lift Through Enhanced Control Systems


Canada is the world’s fifth largest oil producer. This is due in large part to the country’s vast reserves in and around Alberta, which contains the third-largest known oil reserves in the world.

Calgary-based ARC Resources Ltd. has called this oilrich region home for more than 20 years. The company has assets distributed across western Canada and operations that include E&P and development of conventional oil and natural gas.

Just across Alberta’s western border in northeast British Columbia, ARC Resources is one of the largest operators in the Montney region, which is considered one of the best tight gas plays in North America. And it was here that ARC Resources recently decided to begin optimizing the control systems it was using for its large multiwell natural gas production sites. The existing systems in place at these sites didn’t support artificial lift, which would soon be needed to maintain production levels. The systems also presented both expansion and safety challenges that the company wanted to address.

Operations at a crossroad

ARC Resources already had optimization programs at its smaller pads that contained only one to four wells. Control systems in place at these pads supported the use of artificial lift systems to help maintain or increase production as these wells depleted.

Larger pads of five or more wells, however, lacked control systems to support artificial lift systems. As some of these sites approached production milestones of 10 to 15 years, the company knew that it would need to make improvements in the near future.

“We were very successful with using assisted lift to keep production stable in the smaller fields,” said Charlie Kettner, programming specialist for ARC Resources. “We didn’t have the same optimization option in our bigger pads. So our production engineers wanted to find a control solution that would allow us to bring artificial lift to these fields as well.”

The existing controllers were not capable of handling the large amount of integrated operations required to run the entire well pad. As a result, the company had to use multiple controllers hardwired together along with remote terminal units (RTUs). This approach not only made the control infrastructure more complex and thus more prone to mistakes but also limited the amount of information available for control and monitoring.

The use of multiple hardwired controllers also presented safety challenges. ARC Resources relies on its control architecture to monitor toxic and explosive gases and to take actions such as turning on an exhaust fan or blocking wells as conditions dictate. But the controllers could lock up and freeze their outputs and give no indication that there was a fault. This forced the company to add “watch dog” timer hardware to monitor for such conditions.

A ‘canned package’

Kettner reached out to Rockwell Automation to begin discussions about optimization options that would support artificial lift systems at the large multiwell pads as well as simplify control and address safety concerns.

Their talks led them to the ConnectedProduction well manager system from Rockwell Automation, which includes an out-of-the-box Allen-Bradley ControlLogix programmable automation controller (PAC) and FactoryTalk View human-machine interface that requires no custom coding. The PAC gives ARC Resources single-platform control for large sites with up to 32 artificial lift wells and contextualized production information to help operators maintain optimal production levels and troubleshoot issues.

“It’s a canned package,” Kettner said. “You order it, install it and plug in your data to the points it’s looking for, and away you go.”

Kettner and his team decided to pilot the new technology at an eight-well production site named Sunrise near the town of Dawson Creek, British Columbia, before installing it at four other multiwell pad sites.

One of the benefits they first discovered during this trial run was the add-on instructions included in the ConnectedProduction, which helped them save about two days of programming during the installation process. Because the technology uses an open architecture, integration with other vendor hardware at the site was easy.

Enhanced visibility and safety

ConnectedProduction has eliminated the need for multiple controllers and RTUs that were previously in place at the Sunrise site. Now all well pad controls have been consolidated into a single control platform. In addition to simplifying the architecture, this will help lower hardware and software costs for the site.

The system also enables the use of artificial lift systems, including on/off timers and plunger lift systems, and provides visibility into those systems.

“Operators can track events in the Connected- Production solution to see what stage we’re in of the optimization cycle and make better decisions about what to do next,” Kettner said. “Operators can see, for example, that a timer well is not producing anymore and move to the next step of putting a plunger in the hole.”

The new system also is helping ARC Resources enhance safety by reducing the risk of faults going undetected at the Sunrise site.

“Now if something goes wrong with the processor, or if an I/O [input/output] rack comes undone, the ControlLogix platform can fault to a safe state where it shuts down all the processes,” Kettner said. “It takes all the power off the solenoids and essentially results in an emergency shutdown.”

Another benefit of the ConnectedProduction system is that it can support a flow-measurement card within the control panel. This has allowed Kettner to eliminate the use of a separate flow-measurement computer, which is saving his company tens of thousands of dollars at the site.

“We just plug the card into the rack, and it communicates on the backplane,” Kettner said. “It’s given us huge cost savings.”

Looking ahead, Kettner already has orders in to bring the ConnectedProduction system to at least four more large multiwell pads in the area.

“We’ve seen the value of the Rockwell Automation solution and want to bring it to our other sites where we need assisted lift,” he said. “On new pads we’ll implement this right from day one so it’s there and available when it’s needed. And we can just turn it on.”
Read More → Optimizing Artificial Lift Through Enhanced Control Systems

Thursday, November 30, 2017

Big Shale Technology

oil gas well drilling

Shale oil engineer Oscar Portillo spends his days drilling as many as five wells at once— without ever setting foot on a rig.
Part of a team working to cut the cost of drilling a new shale well by a third, Portillo works from a Royal Dutch Shell Plc office in suburban Houston, his eyes darting among 13 monitors flashing data on speed, temperature and other metrics as he helps control rigs more than 805 km (500 miles) away in the Permian Basin, the largest U.S. oil field.
For the last decade, smaller oil companies have led the way in shale technology, slashing costs by as much as half with breakthroughs such as horizontal drilling and hydraulic fracking that turned the United States into the world’s fastest-growing energy exporter.
Now, oil majors that were slow to seize on shale are seeking further efficiencies by adapting technologies for highly automated offshore operations to shale and pursuing advances in digitalization that have reshaped industries from auto manufacturing to retail.
If they are successful, the U.S. oil industry’s ability to bring more wells to production at lower cost could amp up future output and company profits. The firms could also frustrate the ongoing effort by OPEC to drain a global oil glut.
“We’re bringing science into the art of drilling wells,” Portillo said.
The technological push comes amid worries that U.S. shale gains are slowing as investors press for higher financial returns. Many investors want producers to restrain spending and focus on generating higher returns, not volume, prompting some to pull back on drilling.
Production at a majority of publicly traded shale producers rose just 1.3%over the first three quarters this year, according to Morgan Stanley. But many U.S. shale producers vowed during third-quarter earnings disclosures to deliver higher returns through technology, with many forecasting aggressive output hikes into 2018.
Chevron Corp. is using drones equipped with thermal imaging to detect leaks in oil tanks and pipelines across its shale fields, avoiding traditional ground inspections and lengthy shutdowns.
Ryan Lance, CEO of ConocoPhillips—the largest U.S. independent oil and gas producer—sees ample opportunity to boost both profits and output. ConocoPhillips also oversees remote drilling operations in a similar way to Shell.
“The people that don’t have shale in their portfolios don’t understand it, frankly,” Lance said in an interview. “They think it’s going to go away quickly because of the high decline rates, or that the resource is not nearly that substantial. They’re wrong on both counts.”
Shell, in an initiative called “iShale,” has marshaled technology from a dozen oilfield suppliers, including devices from subsea specialist TechnipFMC Plc that separate fracking sand from oil and well-control software from Emerson Electric Co., to bring more automation and data analysis to shale operations.
One idea borrowed from deepwater projects is using sensors to automatically adjust well flows and control separators that divvy natural gas, oil and water. Today, these subsea systems are expensive because they are built to operate at the extreme pressures and temperatures found miles under the ocean's surface.
Shell’s initiative aims to create cheaper versions for onshore production by incorporating low-cost sensors similar to those in Apple Inc.’s Watch, eliminating the need for workers to visit thousands of shale drilling rigs to read gauges and manually adjust valves. Shell envisions shale wells that predict when parts are near mechanical failure and schedule repairs automatically.
By next year, the producer wants to begin remote fracking of wells, putting workers in one place to oversee several projects. It also would add solar panels and more powerful batteries to well sites to reduce electricity and diesel costs.
Oil firms currently spend about $5.9 million to drill a new shale well, according to consultancy Rystad Energy. Shell expects to chop that cost to less than $4 million apiece by the end of the decade.
“There is still very little automation,” said Amir Gerges, head of Shell's Permian operations. “We haven’t scratched the surface.”
Technology, Geology
Much of the new technology is focused on where rather than how to drill.
“There is no amount of technology that can improve bad geology,” said Mark Papa, CEO of shale producer Centennial Resource Development Inc.
Anadarko Petroleum, Statoil and others are using DNA sequencing to pinpoint high potential areas, collecting DNA from microbes in oil to search for the same DNA in rock samples. ConocoPhillip’s MRI techniques also borrow from medical advances.
ConocoPhillips next year will start using magnetic resonance imaging (MRI) to analyze Permian rock samples and find the best drilling locations, a technique the company first developed for its Alaskan offshore operations.
EOG Resources Inc. last year began using a detailed analysis of the oil quality of its fields. The analysis, designed by Houston start-up Premier Oilfield Laboratories, helps to speed decisions on fracking locations and avoid less productive sites.
Premier has reduced the time needed to analyze seismic data to find oil reserves from days or weeks to seconds. Such efficiencies serve two purposes, said Nathan Ganser, Premier’s director of geochemical services.
“It’s not only removing costs thatare superfluous,” he said. “It’s boosting production.”
Read More → Big Shale Technology

Tuesday, November 28, 2017

Preperation Drilling Operation

oil gas well drilling

In the baseline system, all of the equipment necessary for the drilling operation is organized around the derrick, or mast. This is a steel tower , ranging from 50' to 180' in height, which supports the drill pipe with the bit and all the other downhole equipment, and which provides a platform for much of the other equipment necessary to drill the hole. 

Every rig, except for the smallest ones, has a floor just above ground level where most activity required to operate the rig takes place. The driller, who has minute-by-minute control of the rig's operation, has a console here and most pipe handling (adding a new piece of pipe, making and breaking drill string connections, changing bits, etc.) takes place on the floor. In smaller rigs, the mast and the floor are a unit and are simply raised into position in preparation for drilling. 

Bigger rigs, which may require 50 to 60 large truck loads for transportation, are usually assembled at the drill site, a job which may take s e v d days, even in accessible locations on land. offshore, or in locations with difficult access, this assembly is much more complex and time-consuming. Eventually the mast will be erected, the power generation system on-line, the fluidhandling equipment plumbed together, and the myriad other smaller components in place; only then is the rig ready to begin drilling a hole 
Read More → Preperation Drilling Operation

New drilling technologies could give us so much oil

drilling oi gas  new technology

New oil drilling technologies could increase the world’s petroleum supplies six-fold in the coming years to 10.2 trillion barrels, says a report released today by market research firm Lux Research.

The most common and controversial technique is hydraulic fracturing, or fracking, in which chemical-laced water is injected to break up subterranean rock formations to extract oil and natural gas. But the Lux report details a host of exotic so-called Enhanced Oil Recovery (EOR) technologies—from solar-powered steam injection to microorganisms—that could be used to extend the life of old oil fields and gain access to so-called unconventional petroleum reserves like oil sands.

“In light of current oil prices, the peak oil hysteria and projection of $300 [a barrel] prices of a few years ago seem overblown – if not outright silly,” the report states. “But in a sense, they were accurate forecasts of what would have happened if EOR technologies had not come online and made unconventional oil reserves – which vastly exceed conventional ones – accessible.”

But don’t ditch your electric car just yet. The development of such technologies is predicated on high oil prices – at least $100 a barrel – to offset the costs and induce a conservative industry to invest in and deploy new methods. And many of the technologies are still young.

Moreover, as we’ve seen with fracking, political opposition to technologies that could pollute the environment and use lots of water could derail their use. And as climate change accelerates, opposition to carbon-intensive extraction of fossil fuels and their expanded use is sure to grow.
Still, here are some of the technologies startups and multinationals alike are pursuing:

Thermal intervention injects steam into wells to extract heavy oils or oil sands. The problem is, it takes a lot of energy to generate that steam, so some oil companies are turning to solar energy instead of natural gas or other fossil fuels. Chevron, for instance, has deployed solar fields built by BrightSource Energy and GlassPoint Solar at old oil fields in California to help recover heavy petroleum.

Chemical EOR injects polymers and alkaline compounds into oil fields to help loosen oil from rock formations and push it into production wells. The China National Petroleum Corporation is the leader in this method, which it is betting will be 20% more efficient than just flooding wells with water to bring oil to the surface. But in the US, expect opposition to introducing large volumes of chemical underground anywhere near water supplies. Some other drawbacks: Chemical EOR doesn’t work well in oil reservoirs where temperatures are high and there’s a lot of salt and sulfur.

Microbial EOR uses environmentally benign microorganisms to break down heavier oils and produce methane, which can be pumped into wells to push out lighter oil. The technology dates from the 1950s but only recently has it been put to limited use. An experiment with microbial EOR in Malaysia, for instance, increased oil production by 47% over five months. But oil and gas engineers are not biologists, the report notes, and may be reluctant to embrace the technology.
Read More → New drilling technologies could give us so much oil

Well’s Production prediction with Microseismic Technology

drilling technology

With efficiency being crucial when every dollar counts, operators in unconventional plays could add microseismic technology to fracture modeling methods to gain insight into permeability advances and better forecast production.

That’s according to Sudhendu Kashikar, vice president of completions evaluation for MicroSeismic Inc.

Understanding drainage volume and improved permeability of stimulated rock are essential to forecasting production, he said. Typically, several models are used to accomplish this, but the approach has its drawbacks.

A single frack model per stage ignores geological variations along the wellbore. Plus, a discrete fracture network (DFN) model is needed to determine how fracturing actually improves the permeability of stimulated rock, Kashikar said.

Microseismic techniques can simplify the workflow and help with production forecasting, Kashikar said during a webcast June 16.

“Technology and procedures were developed to discriminate the microseismic events and fractures described by these events, capturing propped versus unpropped fractures,” Kashikar said while describing Productive-stimulated rock volume (Productive-SRV) technology. “A rock volume capturing the proppant-filled refractures showed much better correlation to the cumulative production than the total stimulated rock volume.”

Productive-SRV technology estimates how much stimulated fracture remains open through proppant placement by using estimated target zone productivity, a DFN, propped fracture estimate and the Fat Fracture drainage estimate, according to MicroSeismic’s website.

Focus is usually on the location of the proppant, but focus should also be on the amount of improved permeability achieved within the SRV or the Productive-SRV, he said.

Understanding and measuring such improvements will lead to the next step in reservoir stimulation and production forecasting, he said.

Using microseismic data has proven beneficial in establishing a deterministic DFN, which shows fractures detected through seismic.

“For every microseismic event we describe a fracture plane. The size is guided by the magnitude, and the orientation comes from the focal mechanism,” he said. “This is much easier to do with surface microseismic.”

The model is calibrated to actual fluid volumes pumped for a well. A mass balance approach is used to fill the fractures with proppant starting from the wellbore moving outward until the proppant is consumed for that stage, Kashikar explained. Once the fracture network and the propped network have been established, a geocellular grid can be superimposed to obtain the SRV and productive SRV to capture the proppant-filled rock volume, he said.

“One advantage of this workflow is the ability to capture fracture intensity—the number of fractures, the orientation of these fractures—to quantify the permeability enhancement achieved,” Kashikar added.

Key steps for the production forecasting workflow are describing three reservoir volumes—the productive SRV (the propped fractures), total SRV (includes propped and unpropped fractures) and the permeability scalar for individual cells within each region to determine how permeability improved for neighboring cells.

This workflow, he said, captures not only the size and shape of the drainage volume but also permeability within the drainage volume.

The process is a big step forward, he said, in understanding and determining the effectiveness of hydraulic fracturing.

“Rather than relying on a single representative fracture model, we can fully and accurately capture the variable fracture geometry and fracture intensity for the entire length of the wellbore, providing a much better production forecast,” Kashikar said. “We can now use the productive stimulated rock volume and the stimulated rock volume with permeability scalars to directly and explicitly describe the reservoir volume in the reservoir simulator.”

Source: www.epmag.com
Read More → Well’s Production prediction with Microseismic Technology

Monday, November 27, 2017

Rig Automation Maximizes Value For Contractors And Operators

oi gas drilling equipment

Drilling a well is a complex mix of overwhelming data and tasks in need of constant attention. To address the challenge of repetitive complexities of machine and process control, the NOVOS process automation platform was launched by NOV after an extensive development period.

The system provides a common platform for the control, monitoring, scheduling and optimization of drilling operations. This enables drillers to focus on what is important while they consistently execute repetitive drilling activities to achieve the well program by integrating the best of human and equipment capabilities.

offshore rig

The NOVOS process automation platform manages rig equipment to execute drilling programs, allowing the driller to focus on safety and process execution. (Source: NOV)


Compatibility

The structuring of data and defining activities through process automation enables engineers to develop lessons learned and apply best practices across regions and rig fleets, regardless of rig specifications or location. The system is scalable, not custom-built, so it does not require extensive R&D for it to work with each new deployment.

NOVOS is simply dropped on top of the existing NOV control system, creating a quick and rapid deployment. The scalable installation enables the system to be easily placed on rig fleets, which increases overall consistency, enhances the performance of the entire fleet and gives the end user the ability to plan ahead.

The system is equipped with applications that immediately allow the rig to drill faster, safer and more effectively. It also has the capability to incorporate customized applications for specific drilling requirements.

A software development kit allows developers to create and deploy their own optimization applications that use sensor data to control rig machines. Third parties are provided with safe access to a wide variety of functions within the system and encouraged to develop applications that address their unique challenges. Those applications can then be layered, prioritized and partitioned to provide simple flexibility of control and monitoring in ways that were previously unachievable.

There are five major operators and service companies working to develop applications compatible with the platform, with development pending with nine more companies.

The platform today

Years of development were spent to ensure NOVOS was built with a foundation of stability, flexibility and ease of scalability to be valuable in bringing practical automation to the drilling process.

In the years since its launch the platform has successfully been installed and commissioned on 19 land rigs. There are five additional installs scheduled but pending rig availability. The system is installed on rigs in Oklahoma, Pennsylvania, Texas and Canada. Precision Drilling currently has the system installed on 18 land rigs. In second-quarter 2017 a system was purchased by Beaver Drilling for installation on its Rig 15.

The NOVOS team is actively training drillers on rig location depending on rig and resource availability. During the training process drillers are easily picking up the system and becoming even more proficient over time.

Value in the numbers

NOVOS was recently deployed during a rig move for Precision Drilling. The early results showed the company’s drillers achieved consistent bottom-to-bottom time savings—a 10% improvement bottom-to-slips, 18% faster add-stand and a 67% improvement slips-to-bottom—yielding overall time savings of 41% per connection.

To evaluate connection time improvements, NOV compared the five best consecutive bottom-to-bottom cycles for conventional drilling against five consecutive cycles of NOVOS-enabled drilling. There was a reduction in average bottom-to-bottom time from 7.91 minutes to 4.67 minutes using NOVOS, demonstrating a significant improvement in Precision’s performance. The increased consistency created by automating repetitive tasks resulted in an increased awareness of safety and successful delivery of the overall drilling operation.

Assuming six wells per pad and 20 total days of drilling time per well, connection time savings translated to nine hours saved per well and 2.25 days saved per pad on average, enabling the drilling contractor to better plan service delivery, allocate resources and move quickly to the next pad. The total savings added up over time yielded higher profits and rates of return on the customer’s initial investment.

drilling operation

Precision Drilling saw a savings in overall connection-to-connection time and delivered a consistent drilling process with its use of NOVOS. (Source: NOV)


Next steps

As NOVOS begins to make its way on to several rigs, the surface is just being scratched on how the automation can be used. There are many repetitive functions that are still performed manually that can be brought into the control system. Right now, consistent and repetitive tasks are automated on the drill floor, but there are other areas on the rig where repetitive tasks could be automated.

Features added since the release of NOVOS include, but are not limited to, reaming, rocking, torque and drag, and a downlinking interface. The ease of updates and enhancements further shows the flexibility of the NOVOS platform. As for next steps, an improved user interface based on driller feedback also is being developed. The additional features and new user interface are scheduled to be released in third-quarter 2017, and work toward finalizing offshore capabilities for gel breaking and envelope protection are underway.
Read More → Rig Automation Maximizes Value For Contractors And Operators

Sunday, November 26, 2017

Mobile Field Gas Conditioning Technology


The increasing popularity of dual-fuel engines for powering drilling and completions operations in the U.S. has led to a reduction of diesel fuel by up to 70%, according to Navigant Research. Not only does the use of field gas make refueling simpler, but it also reduces the number of fuel delivery trucks on the road as well as the need for “hot” fueling and flaring off unwanted gas. However, the biggest benefit of the use of field gas is the cost savings delivered in the form of reduced diesel fuel bills.

A traditional drilling rig, according to Navigant, can require upward of $2.5 million per year in diesel fuel costs. With potential savings like this, along with the other benefits created through its use, the adoption of dual-fuel systems as an alternative to diesel systems is increasing, especially in regard to their use in hydraulic fracturing spreads. Navigant reported that the annual dual-fuel engine revenue in the U.S. is expected to grow to more than $58.1 million by 2024.

For all of the benefits provided by dual fuel, there are a few challenges. For example, availability of existing natural gas gathering lines as well as the compatibility of the field gas Btu and the moisture content with the engine are the primary challenges that have helped create an environment for innovative solutions.

Challenge remover

Nacelle Solutions, a West Virginia-based provider of fueling solutions, developed a flexible mobile technology that is contained in a small footprint to condition all forms of field gas for use in engines during drilling and completions operations. This technology, known as Dwight, specifically addresses the issues of high Btu, high moisture content and more in an onsite trailerbased field gas conditioning system.

“We saw operators moving toward wanting to utilize natural gas to displace diesel fuel,” said Gov Graney, co-founder of Nacelle Solutions. “Well economics was one of many reasons for this shift. On a completions site it is not unrealistic for operations to burn through 15,000 gallons of diesel fuel in a day. So, at $2.50 per gallon, you’re looking at $37,500 per day spent on diesel fuel.”



The Dwight mobile field gas conditioning system processes rich source gas to power high-horsepower completions operations. (Source: Nacelle Solutions)


Engine technology has developed to the point where dual-fuel engines are readily available and have been proven to work well with the proper gas specifications, including Btu content below 1,100, according to Graney.

“The challenge for dual-fuel engines came from areas with high Btu and/or moisture content in the gas. To gain the benefits of utilizing field gas, this challenge needed a solution,” he said.

Seeing this as an opportunity to provide a service to an opening market, Nacelle Solutions was founded, and the Dwight mobile field gas conditioning system was developed.

“The Dwight enables a high-Btu source gas to be used as field gas by conditioning the gas stream to a specification that will maximize performance of the engine without damaging it,” he said.

Preplanning ensures that the mobile system is configured to work with the composition of the inlet gas source. The unit is connected to a single source of gas, typically tying directly into the customer’s gathering system. The completely self-contained system is built on a 15-m (48-ft) drop-deck trailer and can be deployed either onsite or on an adjacent pad, according to the company.

“After going through a series of regulators, knockout scrubbers, slug catchers and more, three streams of gas exit the system: one containing conditioned gas to power the equipment, an enriched stream that flows back into the customer’s pipeline and another containing free-standing produced fluids,” Graney said. “Everything stays in gaseous form with the system, [and] there are no natural gas liquids created, so therefore there is no need to store or handle natural gas liquids throughout the process. The system is typically brought in when the Btu content is over 1,100. We have a separate system for handling gas with Btu under 1,100.”

With an estimated 40% reduction in diesel fuel costs, according to the company, the No. 1 benefit is cost savings.

“Another benefit is the reduction in the carbon footprint on each location,” Graney added. “That is due to the reduction of fuel delivery trucks that are coming on the location burning diesel fuel as well as diesel being utilized in the engines there. From a safety standpoint it reduces the amount of hot fueling that is required on site.”

Case study

Pennsylvania-based Eclipse Resources worked with Nacelle early on in the development of the Dwight mobile field gas conditioning system. The system was deployed for operations at its Purple Hayes #1 superlateral well drilled in Ohio’s Utica Shale in 2016. According to Oleg Tolmachev, executive vice president and COO of Eclipse, the mobile field conditioning unit solved the challenge of using high-Btu gas and moisture-containing gas to where it becomes usable by dual-fuel engines.

“Specifically, Nacelle’s mobile equipment was the first of its kind at the time when we began utilizing it, and in fact we deployed the first prototype unit,” he said. “Cost savings and financial arrangements with Nacelle are proprietary information, but suffice it to say that these savings are significant, and we have been utilizing this technology in all of our completions operations.”
Read More → Mobile Field Gas Conditioning Technology

Extend Lateral Reach with Buoyancy-assisted Casing Equipment (BACE)


A major challenge in lengthy horizontal or highly deviated wellbores is running the casing string to depth. Drag between the casing string and the formation can often exceed the load capacity of the casing hook, preventing tools from reaching optimal setting depth. This challenge is compounded in shallow horizontal wells. Finding a way to minimize the drag is the key to extending the reach of highly deviated and horizontal wellbores.

A technique developed to “float” the casing into the wellbore using buoyancy-assisted casing equipment (BACE) allows operators to run casing to the bottom of these particularly challenging wellbores. Paired with floating equipment, the application of BACE traps lightweight fluid or air in the lower section of the casing string, thereby reducing the weight of the casing. The lighter weight reduces drag by lifting the casing string away from the formation wall and minimizes the surface area contact of friction.

This technique enables increased running depth and decreased potential for casing buckling or sticking. To simplify its application, BACE is fully integrated with the casing string, and it helps reduce risk because it has no outer shear pins posing potential leak points. Additionally, the tool doesn’t require debris barriers that can obstruct free flow in the casing. As opposed to other methods or alternatives, BACE does not leave behind any trace of rupture disc within the casing wall, which can impair fracture plug deployment during plug-and-perf operations.

Three recent jobs in unconventional shale plays involving lengthy lateral casing strings illustrate the effectiveness of the BACE technology to overcome challenges.

Reaching out in the Western Hemisphere

In the first case study an operator planned an extended lateral well of about 3,962 m (13,000 ft), anticipating challenges getting the casing to planned depth. The operator also was concerned about the compatibility of equipment throughout the casing string for cementing and future operations.

Halliburton performed analysis on the wellbore and determined that the best way to set the casing would be to use BACE along with a fullbore pressure-operated fracturing sleeve. Additional torque and drag analysis identified the need to create a buoyant chamber at the heel of the wellbore.

While the service company was executing the job, BACE ruptured at the planned applied casing pressure. After successfully removing the buoyant air chamber, technicians launched the bottom plug from the surface, landed it down on the BACE plug and released it to initiate displacement. During the cement job the plugs were successfully pumped through the RapidStart Initiator Casing Test without incident, proving compatibility and allaying concerns the operator had in the planning stage.

Challenges in the Eastern Hemisphere

In the second case study an operator planned to run about 3,200 m (10,500 ft) of casing in a lateral wellbore and achieve both planned total depth (TD) and topof- cement for zonal isolation. Because the job would be the operator’s longest lateral, it was extremely concerned about successfully executing to plan.

Halliburton performed torque and drag analysis using the wellbore parameters and determined BACE would be the best course of action placed at the heel of the wellbore. Additionally, cement design modeling suggested the use of an external sleeve inflatable packer collar (ESIPC) for second-stage cementing. Executing the job, the extended- reach casing was floated to planned TD using BACE, and the success of the run eliminated the contingency of running a smaller liner to achieve TD. All displacement measurements for the cement plugs and the BACE were in accord with the job design, and the ESIPC functioned properly, enabling the displacement of the second-stage cementing to achieve planned top of cement.

Specialty casing application with fiber optics

In the third case study an operator sought to set casing in a well with a true vertical depth of 3,246 m (10,650 ft), a measured depth of 6,390 m (20,967 ft) and a bottomhole temperature of 137.7 C (280 F). The operator also wanted to run fiber optics as it considered the well something of a “science project” to monitor in situ conditions and provide data for future well development in the area.

The Halliburton team proposed using BACE and, after conducting torque and drag analysis with wellbore conditions, it determined the technology would work best near the heel of the wellbore. The subsequent four months of planning and preparation for the job entailed mobilizing the necessary downhole tools, surface equipment and field personnel to the site and conducting a critical well review to ensure all elements of the operation were coordinated.

The execution phase began with the team positioning the BACE about 2,438 m (8,000 ft) from the end of the string and then successfully floating the casing and fiber optics to TD. Next, pressure inside the casing was increased to 1,250 psi and ruptured the disc as planned, which separated the 10 parts per gallon well fluid from the air-filled chamber. Finally, the team circulated about 1,000 bbl of fluid to ensure that all of the air in the buoyancy chamber was depleted, after which the cement job was performed.

With critical data being fed back to the operator, the BACE provided a successful outcome, according to the operator. During the planning phase the operator estimated the job of running fiber optics with the casing would take three to five days at a pace of running about four joints of casing per hour. By using BACE the operator was able to run about 14 joints of casing per hour and cut three days from the operation, reducing time and costs.

As lengthy horizontal and highly deviated wellbores become increasingly common, the application of this type of technology could become a more widely used technique in more places around the world.

source: www.epmag.com
Read More → Extend Lateral Reach with Buoyancy-assisted Casing Equipment (BACE)

Oil Exploration With Gravity And Magnetic Geophysical Methods

Gravity and magnetic methods are an essential part of oil exploration. They do not replace seismic. Rather, they add to it. Despite being comparatively low-resolution, they have some very big advantages.

These geophysical methods passively measure natural variations in the earth’s gravity and magnetic fields over a map area and then try to relate these variations to geologic features in the subsurface. Lacking a controlled source, such surveys are usually environmentally unobjectionable.

At a comparatively low cost, airborne potential field surveys can provide coverage of large areas. Allowing quick regional coverage, even gravity surveys can now be recorded from an aircraft with airly high reliability.

In Canada, digital regional gravity and magnetic data are available at zero cost from federal government agencies. Local and detailed surveys are acquired by exploration companies.

Because many college programs tend to overemphasize seismic as almost the only geophysical tool for oil exploration, other methods are sometimes overlooked by explorationists and managers. Where useful gravity and magnetic data are disregarded, risk reduction is incomplete, and the results of exploration programs are less reliable.

What anomalies mean

The physical rock property that links gravity anomalies to rock composition is density. The rock property that links magnetic anomalies to rock composition is total magnetization. Thus, each potential-field method valuable provides its own picture of the subsurface.

Density is scalar, but magnetization is a vector total of a vast and commonly unpredictable variety of remanent and induced magnetizations. Unlike density, magnetization can depend on very slight variations in the occurrence and distribution of particular minerals, which may have little relation to the overall lithology.

A geophysical anomaly is the difference between the observed (measured) geophysical field value and the value that would be observed at the same location if the Earth were more uniform. Nonuniformities in the physical properties of rocks give rise to geophysical anomalies.

Being responsive to lateral variations in rock properties, gravity and magnetic methods are best suited for detecting steep discontinuities such as faults. Seismic methods, by contrast, are best for detecting vertical rock variations and low-angle discontinuities such as layer boundaries.

The gravity field is simple, unipolar and almost perfectly vertical. The geomagnetic field is complicated: It has two or more poles, and it is commonly strongly nonvertical. Besides, it changes all the time, necessitating frequent updates by government agencies.

Gravity lows (negative anomalies) occur where rocks in the subsurface have a comparatively low density, which reduces their downward gravitational pull. Where the rock density is relatively high, the gravitational pull is increased, and a gravity high (positive anomaly) occurs.

Magnetic anomalies are more complex because the magnetic field and rock magnetization are both complicated. With a nonvertical dipolar field, a single rock-made anomaly source can be deceptively associated with a pair of apparent anomalies: a high and a low side by side.

Gravity and magnetic surveys should be designed purposefully to resolve the specific kind of anomalies that are expected from geologic targets of interest in a particular study.

Gravity and magnetic surveys should be designed purposefully to resolve the specific kind of anomalies that are expected from geologic targets of interest in a particular study. If a survey is too tight, money is wasted on redundant coverage. If a survey is too sparse, the desirable anomalies are undersampled and not delineated sufficiently. The idea is to design the sparsest and smallest, hence cheapest, survey that would resolve all the expected desirable anomalies.

Examples of exploration use

In the platformal Phanerozoic Alberta and Williston basins, most big magnetic and gravity anomalies are associated with ductile structures and rock composition variations in the crystalline basement inherited from orogenic events in the Precambrian. Such ductile ancient structures were fairly seldom reactivated, and they had relatively little influence on the Phanerozoic basins above.

More important are the later brittle basement faults and fractures, whose offset can be as little as a few meters, sometimes below seismic resolution.

Such brittle faults had a variety of direct and indirect influences on many intervals in the Phanerozoic sedimentary cover. They are commonly associated with subtle gravity and magnetic lineaments, some of which cut across the regional pattern of major anomalies. To help delineate fault networks, researchers created a regional gravity and magnetic atlas of the southern and central part of the Alberta Basin.

A gravity or magnetic lineament can be a gradient zone, linear break in the anomaly pattern, straight anomaly or even an alignment of separate local anomalies. Long lineaments are more likely to be associated with faults than short ones, especially if they occur in swarms or are a part of a regional pattern.

The best data processing methods are simple and intuitive so that derivative maps and anomalies are easy to relate to their precursors in the raw data.

Gravity and magnetic data can be processed specifically to highlight subtle lineaments (Figure 1). Particularly useful processing methods tend to be first and second horizontal and vertical derivatives, third-order residuals, automatic gain control, total gradient (analytic signal) and shaded-relief maps (shadowgrams). Wavelength filtering has a major pitfall in that Gibbs ringing can produce lineament-like artifacts, so it is best avoided.



FIGURE 1. This regional horizontal-gradient magnetic map of central and southern Alberta shows selected lineaments highlighted as straight white lines (after Lyatsky et al., 2005). (Source: Lyatsky Geoscience Research & Consulting Ltd.)

To help identify faults, gravity and magnetic lineaments should be compared with topographic and drainage lineaments. Seismic data and geological studies can help to determine if suspected faults had an influence on any particular play interval.

In horst and graben basins such as the offshore Queen Charlotte Basin on the west coast of British Columbia, the first step is to examine geological information from the surrounding areas on land and from drillholes in the basin. The pattern of raised and lowered crustal blocks in and around the basin can be determined from geologic field mapping and from a combination of seismic and gravity data.

Magnetic data (Figure 2) in the Queen Charlotte Basin were used to further delineate the networks of local and regional faults. Seismic data in this basin suffer from an uneven maximum depth of signal penetration due to the presence of numerous volcanic stringers. On land and offshore magnetic data were instrumental in the delineation of extrusive and intrusive igneous rocks, which was crucial for understanding the patterns of organic maturation.


FIGURE 2. In this horizontal-gradient magnetic vector map of the Queen Charlotte Islands and Hecate Strait, British Columbia, the numbered heavy black arrows indicate magnetic lineaments. Light thin lines indicate the magnetic horizontal gradient, with length proportional to the gradient magnitude and pointing “downhill.” (Source: Lyatsky Geoscience Research & Consulting Ltd.)

Teaching of gravity and magnetic methods

The relatively low priority given to potential-field methods in many oil-oriented college programs impoverishes students and their employers. Where gravity and magnetics courses exist, too often they focus—with intimidatingly advanced mathematics—on the physics of potential fields at the expense of exploration applications, survey design and methods of geological interpretation.

Too many gravity and magnetics textbooks are also very mathematical (with a superb exception of Nettleton, 1971). Too little tends to be said about the relationships between anomalies and variations in rock composition, which is the key to geological interpretation.

Misleadingly, numerical inversions of potential fields data are sometimes presented as interpretations. However, mathematics is abstract. Interpretation is essentially geological, with geophysical data used to provide geological information.

When geologists, seismologists and potential fields experts are too narrowly specialized, they do not talk to each other enough. The result is commonly disregard of valuable gravity and magnetic information. Alternatively, interpretations are too numerical to be useful if geological considerations are ignored.

Gravity and magnetics experts in oil exploration should talk less in an echo chamber among themselves. They should learn to think more like their clients, who tend to be geologists and seismologists. Their work should be presented from first principles, with minimum mathematics and with maximum geological consideration. Only then can interdisciplinary walls be brought down and exploration managers can vividly see the essential practical utility of gravity and magnetic methods.

Source : www.epmag.com
Read More → Oil Exploration With Gravity And Magnetic Geophysical Methods